1. Technical Parameters & Specifications
| Technical Property | Standard Specifications & Custom Options |
| Model Number | 01 |
| Size | |
| Capacity | |
| Material | PVC |
| Color | |
| Usage |
|
| Packaging Details |
2. Global Trade & Logistical Terms
-
Incoterms Available: FOB, CIF, EXW, DAP, DDP.
-
Payment Terms:
-
30% T/T advance deposit upon order confirmation, 70% T/T balance payment against the copy of Bill of Lading (B/L)
-
Irrevocable L/C at sight.
-
-
Shipping & Logistics:
-
Port of Loading: Shenzhen Port.
-
Shipping Methods: Ocean Freight (FCL – Full Container Load / LCL – Less than Container Load), Intermodal Rail, or Road Transport.
-
Production Lead Time: 15–30 days after deposit confirmation and technical drawing approval.
-
















